Unit commitment
Learning outcomes
By the end of this chapter, the student will be able to:
Identify the difference between the economic dispatch and the unit commitment
Solve basic problems of deterministic unit commitment
Include transmission constraints into the model by a linear power flow formulation.
8.1âProblem definition
The economic dispatch presented in Chapter 7 is a continuous problem decoupled in time; the latter means that current decisions do not affect future operation. However, this picture is incomplete since a power system presents a dynamic behavior due to loadsâ daily changes. Therefore, a dynamical model is required.
The starting-up of a thermal power plant is not instantaneous since the boiler requires suitable pressure and temperature conditions to generate power, as shown in Figure 8.1. Shutting-down is not instantaneous either. Besides, several physical and economic limitations such as the minimum operative time and the maximum off-line time must be considered in the model. All these constraints introduce binary variables into the optimization problem. Thus, the unit starts generating power when the temperature is between Tmin and Tnom; below Tmin the unit requires fuel to maintain the temperature, but the output power is zero. This implies costs that must be included in an optimization model named unit commitment. This problem is discrete since the time in which the unit is connected (committed) or disconnected from the grid (de-committed) is part of the decision; hence the problem dynamic. Additional constraints are also included in the model, related to the ramps of start-up and start-down in each thermal unit. In the following sections, we present the basic model with the most common constraints. As in all the previous chapters, we offer only toy-models in order to understand the problem.
Figure 8.1âSimplified model for the starting-up of a thermal power plant.
Download
This site does not store any files on its server. We only index and link to content provided by other sites. Please contact the content providers to delete copyright contents if any and email us, we'll remove relevant links or contents immediately.
What's Done in Darkness by Kayla Perrin(26528)
Shot Through the Heart: DI Grace Fisher 2 by Isabelle Grey(19009)
The Fifty Shades Trilogy & Grey by E L James(18962)
Shot Through the Heart by Mercy Celeste(18881)
Wolf & Parchment: New Theory Spice & Wolf, Vol. 10 by Isuna Hasekura and Jyuu Ayakura(16988)
Python GUI Applications using PyQt5 : The hands-on guide to build apps with Python by Verdugo Leire(16878)
Peren F. Statistics for Business and Economics...Essential Formulas 3ed 2025 by Unknown(16807)
Wolf & Parchment: New Theory Spice & Wolf, Vol. 03 by Isuna Hasekura and Jyuu Ayakura & Jyuu Ayakura(16703)
Wolf & Parchment: New Theory Spice & Wolf, Vol. 01 by Isuna Hasekura and Jyuu Ayakura & Jyuu Ayakura(16331)
The Subtle Art of Not Giving a F*ck by Mark Manson(14263)
The 3rd Cycle of the Betrayed Series Collection: Extremely Controversial Historical Thrillers (Betrayed Series Boxed set) by McCray Carolyn(14072)
Stepbrother Stories 2 - 21 Taboo Story Collection (Brother Sister Stepbrother Stepsister Taboo Pseudo Incest Family Virgin Creampie Pregnant Forced Pregnancy Breeding) by Roxi Harding(13425)
Scorched Earth by Nick Kyme(12716)
Drei Generationen auf dem Jakobsweg by Stein Pia(10925)
Suna by Ziefle Pia(10847)
Scythe by Neal Shusterman(10271)
International Relations from the Global South; Worlds of Difference; First Edition by Arlene B. Tickner & Karen Smith(9478)
Successful Proposal Strategies for Small Businesses: Using Knowledge Management ot Win Govenment, Private Sector, and International Contracts 3rd Edition by Robert Frey(9317)
This is Going to Hurt by Adam Kay(9105)